Wednesday, March 12, 2008. The required task this week was to photograph a commercial, industrial or educational building which I perceived to be an example of excellence in construction technology in either timber, steel or concrete. Hey, Welcome to my Construction and Structures 2 blog.
The Trade school facility at Box Hill Tafe was completed in 2007. Paul Morgan Architects designed it. The construction of the frame can be seen easily. The building is unusual in several ways. The roof cladding is used on the walls. The floor area has a section of sand which the trade students can use for practice. The building is very open and does not have walls on one end. Thursday, June 5, 2008. Wednesday, June 4, 2008. Monday, May 5, 2008.